22/07/2026
KYK MegaPlaster H201 is a single-component, ready-to-use decorative finishing plaster based on polymer emulsion. It can be applied with a trowel or special application tools to create different textures and patterns. Designed to achieve exposed concrete-look surfaces, it provides an aesthetic, durable, and easy-to-apply solution for both interior and exterior spaces.
🧱 Exposed Concrete Appearance: Creates a modern and industrial look with its special color and texture properties.
🌦️ Weather Resistant: Provides resistance against environmental conditions such as rain, snow, extreme heat, and cold.
🌬️ High Water Vapor Permeability: Allows the façade to breathe, minimizing the risk of blistering and peeling.
🧪 High Alkali Resistance: Offers long-lasting and stable surface performance.
♻️ Water-Based and Environmentally Friendly: Odorless formulation that is safe for human health and the environment.
🧰 Easy Application: Can be easily applied with a trowel and allows different decorative patterns with special tools.
KYK MegaPlaster H201 can be used on:
The surface achieves its concrete color appearance within 24 hours after application.
Values are obtained from laboratory tests performed at 23 ± 2°C temperature and 50 ± 5% relative humidity conditions.
Consumption may vary depending on surface absorbency and roughness.
Packaging: 25 kg plastic bucket
Shelf Life: 12 months (in original, unopened packaging)
Storage Conditions: Store between +5°C and +25°C in a dry environment with maximum 60% relative humidity. Protect from direct sunlight.
The lid must be tightly closed after use.
Where can KYK MegaPlaster H201 be used? It can be applied as a finishing coat on concrete, plaster, drywall, plywood, previously painted surfaces, and thermal insulation plaster systems.
How is the exposed concrete effect created? The concrete texture effect is achieved by creating patterns with a trowel or special tools approximately 15 minutes after application.
Is the product water-based? Yes. It is water-based, odorless, and environmentally friendly.
How long does it take to dry? Initial drying occurs within 24 hours, while full curing is completed in approximately 7 days.
How can color differences on façades be prevented? Products with the same batch and lot numbers should be used on the same façade to ensure color consistency.